Translate   8 w

https://www.selleckchem.com/products/nps-2143.html
The experiments were done with different concentrations of CR and different bed heights of CSF as the PRB for 90 days. There was a delay in the breakthrough time when decreasing the contaminant concentrations and when increasing the composite adsorbent-filter CSF bed height. The breakthrough curves were well represented by the COMSOL model.This study proposed a method for constructing a low impact development (LID) plan to improve the utilization rate of rainwater in a highway service area and solve the problem of waterlogging. Firstly

  • Like
  • Love
  • HaHa
  • WoW
  • Sad
  • Angry