Translate   16 w

https://www.selleckchem.com/PARP.html
Renal fibrosis is a critical pathological process lead to a progressive loss of renal function. Jolkinolide B (J is a natural compound with anti-inflammatory activity from Euphorbia fischeriana Steud. The study evaluated the effect of JB on renal fibrosis in mice with unilateral ureteral obstruction (UUO). The results showed that JB could decrease renal fibrotic area, reduce phosphorylation of NF-κB p65 and the release of TNF-α, IL-6 and IL-1β, restore the expression of vementin, α-SMA and E-cadherin, as well as TGF-β1 and p-smad2/3. In conclusio

  • Like
  • Love
  • HaHa
  • WoW
  • Sad
  • Angry