Translate   1 w

https://www.selleckchem.com/products/lly-283.html
In addition, modules connected in series can tolerate large driver time delay. The SPICE simulation and the double-pulse test are used to validate the effectiveness of the proposed module. The protection performance test was also conducted by using a spark gap to simulate the breakdown fault. Finally, the switch that consists of 64 series-connected modules has been tested at 30 kV/6 A. The turn-off time is ∼5 µs, and the energy during the turn-off transition is 0.283 J. The results show that the switch has good performance.A multi-energ

  • Like
  • Love
  • HaHa
  • WoW
  • Sad
  • Angry