Translate   2 w

https://www.selleckchem.com/pr....oducts/pf-06882961.h
This study analyzes the root causes of cracks in the deck plating around tank manholes. Four handy-size bulk carriers built in one shipyard were analyzed. In all cases, deck cracks were found near manholes, and the average time from the commencement of operation until the occurrence of cracks was 1356 days. Due to this short wear-life of the vessel's structural material, the authors believed that it was unlikely to be caused by corrosion fatigue. The authors hypothesized that main decks cracked around manholes because of very poor-q

  • Like
  • Love
  • HaHa
  • WoW
  • Sad
  • Angry