https://www.selleckchem.com/pr....oducts/Clofarabine.h
The effectiveness of a sequenced biological-physicochemical reactor system for treating sewage was studied. The biological degradation was conducted in a Sequential Batch Reactor, which had innovative features for simplifying the operation and maintenance of the reactor. The reactor was operated at 4, 6, 8, and 12 hr cycle. Up to 82% removal of Chemical Oxygen Demand (COD), 50% removal of Dissolved Organic Carbon (DOC), 45% removal of Total Nitrogen (TN), and 45% removal of Total Phosphorus (TP) were achieved. The treated effluent w