https://www.selleckchem.com/pr....oducts/SB-203580.htm
25 per Megawatt-hour (MWh) electricity generation, reaching an amount of $29,422 annually. Based on the localized results obtained by the modified Airpacts, the external cost of damage to the façades was $0.3 per MWh electricity generation, reaching an amount of $35,720 annually. To overcome the constraints of the original model concerning the constant parameters of mixing height and wind speed in the default model algorithm, the two parameters were considered dynamic variables in the modified model.In the process of gold mining, larg