https://www.selleckchem.com/pr....oducts/elacestrant.h
The purpose of this research is to develop and test the prototype is called the electronic Pressure Injury Alarm. This study was a Software Development Life Cycle, using User Acceptance Testing. Data was collected using a questionnaire instrument on 10 nurses as research respondents. The result was the prototype to which 89.4% of respondents expressed satisfaction. Some of the weaknesses obtained included instability of alarms and inadequate internet access. Electronic Pressure Injury Alarm is a prototype that is used as an early de