https://www.selleckchem.com/pr....oducts/donafenib-sor
Mean operative time was 43.8 ± 8.1 min. and the overall complication rate was 9%. Mean VAS scores at postoperative 24 hours were 2.6 ± 1.2. At the postoperative eighteenth month, no patient had a positive cough test and mean PGI-I score was 2 while two patients had moderate urinary incontinence according to the pad test. Pad test results, ICIQ subscores of voiding QoL, incontinence, incontinence QoL, total score and total QoL score at baseline and eighteen months after surgery were 76.9 ± 19.9, 9.6 ± 4.1, 15.5 ± 4.0, 39.5