Translate   10 w

https://www.selleckchem.com/pr....oducts/17-AAG(Geldan
The potential of bio-energy recovery from real municipal wastewater was investigated using a one-stage pilot-scale submerged anaerobic membrane bioreactor (AnMBR) for a range of HRTs from 24 h to 6 h at ambient temperature around 25 °C. This pilot-scale AnMBR demonstrated a high COD removal efficiency of over 90% during an operation of 217 days for municipal wastewater treatment. The energy balance of the AnMBR was calculated from both theoretical and practical aspects. The theoretical net energy potential was calculated as

  • Like
  • Love
  • HaHa
  • WoW
  • Sad
  • Angry