Translate   2 d

https://www.selleckchem.com/products/snx-2112.html
Duration of temporary drainage ($5050/day, P=.02), delayed repair (P = .03), claim of inadequate workup (P = .03), and claim of failure to supervise trainee (P .001) were significantly associated with increasing award amount. The majority of ureteral injury litigation ruled in favor of the defendant. However, when awarded, the amount was substantial and correlated with drainage duration, delayed repair, claim of inadequate workup, and failure to supervise trainee. These findings highlight factors perceived to be associated with si

  • Like
  • Love
  • HaHa
  • WoW
  • Sad
  • Angry