https://link-alternatif.sdnkebonkacang01.sch.id
https://link-alternatif.mahadaly-situbondo.ac.id
https://link-alternatif.sttd.ac.id
https://link-alternatif.stihnisel.ac.id
The remainder of this initial 17-mile (27 km) alignment was completed on June 25, 1994, when the extension to Lambert Airport Main opened. About 14 miles (22.5 km) of the original 17-mile (27 km) alignment reused existing railroad right-of-way. Construction on the initial MetroLink alignment from St. Louis Lambert International Airport to the 5th Missouri station in East St. Louis began in 199